International Competitive Bidding (Two-Envelope)

Supply and Installation of Security Protection Materials for CEET MV/LV Distribution Installations, Togo

Ref.OP00467023Issued2026-09-08Deadline2026-10-20
Lomé, Togo
Location
Security protection materials for MV/LV distribution installations
Scope
Supply and installation
Contract Nature
2026-10-20 10:00 (local time)
Bid Deadline

01Project Overview

Project Name
Securing access to CEET MV/LV substations: organisation of access management for distribution substations, and the supply and installation of the related protection materials
Reference
World Bank procurement notice OP00467023; tender reference F-06 (international competitive bidding No. AOI N° 001/MDERM/CAB/PRMP/IDEA/2026)
Country
Republic of Togo
Employer
Ministry of Energy and Mineral Resources, for use by the Electric Power Company of Togo (CEET)
Parent Project
Inclusive Development through Electricity Access Project (IDEA), World Bank project P176769
Source of Funds
International Development Association (IDA) Credit IDA-75540
Procurement Method
International competitive bidding (Appel d'Offres International) with a two-envelope process under the World Bank Procurement Regulations for IPF Borrowers, July 2023 edition
Lots
Single contract
Site
CEET industrial customer distribution installations in Togo, as designated by the employer
Contract Duration
The contract is to be performed over 12 months, comprising eight months for delivery of the supplies and four months for the installation services
Source
World Bank notice OP00467023 (Avis Specifique d'Appel d'Offres), employer the Ministry of Energy and Mineral Resources, published 8 Sep 2026, verified 3 Oct 2026: https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00467023
Background Source
World Bank project page P176769: https://projects.worldbank.org/en/projects-operations/project-detail/P176769; Ministry of Energy and Mineral Resources of Togo: https://energie.gouv.tg/

02Project Background

The Inclusive Development through Electricity Access Project (IDEA) in Togo is supported by IDA financing and implemented by the Ministry of Energy and Mineral Resources. Its World Bank project number is P176769; the project was approved in May 2024 with a planned closing date of December 2029. Its development objectives include improving the reliability of electricity supply, increasing access to electricity services, and improving the commercial performance of the distribution company CEET.

Reducing non-technical losses is a key element of improving the distribution company's commercial performance. Accessibility of distribution installations and metering equipment is a principal source of electricity theft and unauthorised interference with metering devices. Physical protection and access-management measures at MV/LV distribution substations and industrial customers' metering installations directly reduce such losses.

The subject of this contract is the supply of security protection materials for industrial customers' distribution installations: protection enclosures for metering equipment and transformers, reinforced electrical cables, and access-control items including security locks, security padlocks and seals, together with the corresponding installation services, in order to reinforce the CEET distribution installations serving industrial customers.

03Scope of Work & Technical Specifications

ItemContent
Scope of ContractSupply and install security protection materials for CEET industrial customers' distribution installations
Protection EnclosuresProtection enclosures for metering equipment and transformers
CablesReinforced electrical cables
Access-Control ItemsSecurity locks, security padlocks and seals
Time for CompletionA 12-month contract: eight months for delivery of the supplies and four months for the installation services
ProcedureTwo-envelope process: the technical part is opened publicly, while the financial part remains sealed in the employer's custody until the second public opening
Document LanguageThe bidding documents are provided in French
← Swipe to view the full table →

04Key Commercial Terms

ItemContent
Bid SecurityA Bid Security of F CFA XOF 36,000,000 is required
Bidding Document FeeThe bidding document costs a non-refundable fee of F CFA 100,000 (approximately EUR 153), payable in cash; the payment receipt must be attached to the technical bid
Time for CompletionThe contract runs for 12 months, comprising eight months for delivery and four months for installation
Bid SubmissionElectronic submission is not permitted. Outer envelopes are marked OFFRE ORIGINALE and inner envelopes PARTIE TECHNIQUE; the financial envelope remains sealed until the second public opening
Performance SecuritySupply and installation contracts normally require the successful bidder to furnish a performance security, commonly in the order of 10% of the contract price
Liquidated DamagesDelay in delivery or installation is normally subject to liquidated damages calculated per day or week of delay, with rates set out in the contract conditions
Price and CurrencyBids and payments are denominated in CFA francs (F CFA XOF)
← Swipe to view the full table →

05Bidder Qualification Requirements

01
Eligibility
Bidders must be firms or joint ventures eligible under the World Bank Procurement Regulations for IPF Borrowers; the tender is open to all eligible bidders
02
Similar Experience
Bidders must have experience in the supply and installation of protection enclosures for electrical equipment, reinforced electrical cables or comparable distribution security materials
03
Technical Compliance
The offered enclosures, cables and access-control items must meet the material, mechanical strength and environmental requirements of the bidding documents, supported by the corresponding test or conformity certificates
04
Financial Capacity
Bidders must submit the financial evidence required by the bidding documents to support the supply and installation obligations over the 12-month contract period
05
Installation Capability
Bidders must have the technical capability and safety management arrangements to carry out installation works on distribution installations in live or near-live conditions
06
Joint Ventures
Joint venture bids are permitted, subject to the composition and eligibility rules of the bidding documents

06Key Milestones

2026-09-08
Notice Published
Business days from 08:00 to 12:00 and from 15:00 to 17:00 (local time)
Document Inspection
2026-10-20 10:00 (local time)
Bid Deadline
2026-10-20 10:30 (local time)
Public Opening (Technical Part)
Opened publicly at a later date after completion of the technical evaluation
Financial Part Opening
Eight months for delivery and four months for installation, 12 months in total
Time for Completion
Contact Us
Room 1602, Tower D, Xiamen Sea World, Xiamen, China