International Competitive Bidding — Open Tender Single Stage

50 MWac Photovoltaic Solar Power Plant with a 20 MWh Battery Energy Storage System (BESS) and Associated High-Voltage Grid Infrastructure at Beni M'Hira, Tunisia

Ref.ECEPP 47137755Issued2026-10-09Deadline2026-12-10
Beni M'Hira, Tataouine Governorate, Tunisia
Project Location
50 MWac solar PV + 20 MWh BESS
Capacity
Design, supply, installation, testing and commissioning
Contract Nature
2026-12-10 09:00 (UK time)
Bid Deadline

01Project Overview

Project Name
50 MWac photovoltaic solar power plant with a 20 MWh Battery Energy Storage System (BESS) and associated high-voltage grid infrastructure at Beni M'Hira
Reference
EBRD Client e-Procurement Portal (ECEPP) ID 47137755; notice ID 47137876; EBRD project ID 56916
Country
Republic of Tunisia — Beni M'Hira, Tataouine Governorate, southern Tunisia
Client
Societe Tunisienne de l'Electricite et du Gaz (STEG)
Financing
A senior loan of up to EUR 30 million from the European Bank for Reconstruction and Development (EBRD), plus a senior loan of up to EUR 20 million from the Clean Technology Fund (CTF)
Procurement Method
Open Tender Single Stage; procurement category Works, conducted under the EBRD Procurement Policies and Rules
Business Sector
Energy EMEA
Source
European Bank for Reconstruction and Development (EBRD) Client e-Procurement Portal (ECEPP) notice (ECEPP ID 47137755, notice ID 47137876), client Societe Tunisienne de l'Electricite et du Gaz (STEG), published 9 Oct 2026, verified 16 Oct 2026: https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=47137876
Background Source

02Project Background

According to the EBRD's published project summary, the project consists of a senior loan of up to EUR 30 million to Societe Tunisienne de l'Electricite et du Gaz (STEG) to finance the construction and development of a 50 MWac photovoltaic solar power plant, a 20 MWh Battery Energy Storage System (BESS) and associated high-voltage transmission infrastructure at Beni M'Hira, in the Tataouine Governorate of southern Tunisia, integrating the project into the Tunisian electricity grid. The project also benefits from a senior loan of up to EUR 20 million from the Clean Technology Fund (CTF). EBRD project ID 56916, status Approved, approval date 22 July 2026, environmental category B.

The EBRD states that the project's BESS workstream will be the first investment in a BESS within Tunisia, and will help unlock Tunisia's renewable energy potential by addressing the intermittency of renewable energy, a key obstacle to the deployment of additional renewables. The quantifiable benefits include increased Tunisian energy production from the additional 50 MWac of capacity added to the grid, as well as reduced greenhouse gas emissions. The unquantifiable benefits include stabilising the grid and removing the first-mover externality risk associated with the novel BESS technology. The project is on the Green Economy Transition (GET) Direct Track, with a transition impact score of 73.

This procurement is the works package of the project. It is issued by STEG as client through the EBRD Client e-Procurement Portal (ECEPP). Contracts are subject to the EBRD Procurement Policies and Rules and are open for participation to firms from any country, unless otherwise specified in the procurement documents.

03Scope of Work & Technical Specifications

ItemContent
Contract ScopeDesign, supply, installation, testing and commissioning of a 50 MWac photovoltaic solar power plant, a 20 MWh Battery Energy Storage System (BESS) and associated high-voltage transmission infrastructure
SiteBeni M'Hira, Tataouine Governorate, southern Tunisia
Generation Capacity50 MWac
Storage Capacity20 MWh
Grid ConnectionAssociated high-voltage transmission infrastructure to integrate the project into the Tunisian electricity grid
Procurement CategoryWorks
Governing RulesThe EBRD Procurement Policies and Rules; the documentation includes detailed technical and financial requirements, lots, eligibility and qualification requirements, contract start date and planned duration
Detailed RequirementsTechnical specifications, equipment lists, grid connection requirements and quantities are set out in the procurement documents, which are available free of charge in ECEPP; unregistered firms may access them after completing a brief registration
← Swipe to view the full table →

04Commercial Terms

ItemContent
Financing and PaymentThe project is financed by an EBRD senior loan together with a CTF senior loan, with payments made at the milestones set out in the contract
Contract FormContracts of this kind, covering a solar plant, a storage system and grid connection works, are usually awarded on a lump-sum basis, with the price covering design, equipment, civil works, installation, commissioning and grid connection
Advance and Progress PaymentsComparable contracts commonly provide a percentage advance payment, with the balance paid in instalments upon delivery of major equipment, completion of installation, commissioning and grid connection
Performance SecurityComparable works contracts usually require a performance security of a percentage of the contract price, together with a warranty security
InsuranceThe contractor is commonly required to take out transport insurance, erection all risks insurance and third party liability insurance, and to comply with the project's environmental and social documentation
Warranty and Defects LiabilityFor comparable projects the warranty period commonly runs from acceptance of the grid connection, and equipment and workmanship defects during the defects liability period are rectified by the contractor at no cost
← Swipe to view the full table →

05Bidder Qualification Requirements

01
Participation
The notice states that contracts are subject to the EBRD Procurement Policies and Rules and are open for participation to firms from any country, unless otherwise specified in the procurement documents
02
Portal Registration
Prospective participants must register on the EBRD Client e-Procurement Portal (ECEPP) to view the documents and submit a response; unregistered parties may access them after completing a brief registration
03
Legal Status
The bidder must be duly established and qualified to design, supply, install and commission solar power plants, energy storage systems and high-voltage transmission works
04
Technical Capability
Comparable projects commonly require utility-scale solar EPC capability, together with the capability to integrate, test and commission battery energy storage systems and high-voltage grid connection works
05
Experience
Evidence of comparable utility-scale solar or storage contracts and grid connection acceptances, with project size and location, is usually required
06
Personnel and Financial Capacity
A project manager and commissioning lead with a background in solar and storage engineering, and financial capacity commensurate with the contract size supported by audited financial statements as required by the procurement documents, are commonly required

06Key Milestones

9 Oct 2026
Notice Published
Available free of charge through the EBRD Client e-Procurement Portal (ECEPP) after a brief registration: https://ecepp.ebrd.com/respond/9X24D8UHNV
Documents Available
10 Dec 2026 at 09:00 UK time; responses are submitted online through the EBRD Client e-Procurement Portal (ECEPP)
Submission Deadline
The contract start date and planned duration are set out in the procurement documents available in ECEPP
Contract Start and Duration

07Evaluation Criteria

Technical and Proposal Evaluation70%
  • The common approach is to evaluate the technical configuration of the solar plant, the technical solution for the storage system and grid connection works, the construction and commissioning organisation, and key personnel qualifications and comparable experience
  • The technical evaluation is usually pass or fail; bids not meeting the technical requirements in the procurement documents do not proceed to price comparison
Price Evaluation30%
  • The common approach is to compare price levels among technically compliant bids, with the price score usually derived from a ranking of prices from lowest to highest