Ethiopia's National Electrification Program (NEP 2.0) guides the country's drive towards universal access, targeting full electrification by 2030, with roughly 65% of connections delivered on-grid and 35% off-grid. The off-grid share is met through solar home systems, solar mini-grids and standalone PV systems for public facilities such as schools and health institutions, covering remote areas where grid extension is not cost-effective.
The World Bank-financed ADELE project (Access to Distributed Electricity and Lighting in Ethiopia, Project ID P171742) aims to increase access to reliable electricity for households, social institutions and enterprises, and includes standalone solar systems and solar mini-grids for health and education facilities, supporting power and water supply at rural facilities. Ethiopia's Ministry of Water and Energy also works with private solar suppliers through Results-Based Financing to widen off-grid solar coverage in remote areas.
In the water, sanitation and hygiene sector, rural water supply facilities in Ethiopia have long relied on diesel pumps, which carry high fuel transport costs and limit continuity of supply. UNICEF Ethiopia's water, sanitation and hygiene programme provides water services to rural health institutions and schools and has installed solar-powered water systems in rural communities. To reduce reliance on diesel pumping and improve the continuity and maintainability of power supply at water facilities, UNICEF is establishing a Long-Term Agreement covering hybrid solar PV generator systems, backup power supply, and borehole risers, casings, pipes and fittings across all regional states of Ethiopia.
| Item | Content |
|---|---|
| Nature of the Agreement | Long-Term Agreement (LTA) for services and goods for UNICEF-supported WASH projects across all regional states of Ethiopia |
| Core Supply Scope | Supply, installation, testing and commissioning of hybrid solar PV generator systems |
| Backup Power | Supply, installation, testing and commissioning of backup power supply, ensuring water facilities keep operating when PV output is insufficient |
| Borehole Materials | Supply and installation of borehole risers, casings, pipes and fittings |
| Auxiliary Items | Supply of auxiliary spare parts and after-sale service following installation |
| Geographic Coverage | All regional states of Ethiopia; the bills of quantities are prepared separately by region, covering Oromia, Amhara, Afar, Somali, Sidama, South Ethiopia, Southwest Ethiopia, Central Ethiopia, Benishangul-Gumuz, Gambella and Harari |
| End Users | Health institutions, schools and community water facilities served by UNICEF-supported rural WASH projects |
| Period of Performance | Services and supplies under the Long-Term Agreement are delivered in phases in line with the implementation schedule of UNICEF-supported projects |
| Solicitation Documents | The solicitation documents comprise the terms of reference, technical specifications, evaluation criteria, bills of quantities and financial rate cards, the technical proposal format and the contractor's experience format |
| Language of Bid | English |
| Item | Content |
|---|---|
| Contract Form | Long-Term Agreements are commonly concluded as rate-based framework agreements, with orders placed against the requirements of UNICEF-supported projects during the agreement period and no fixed purchase volume committed |
| Pricing Basis | Prices are commonly quoted as unit rates against the regional bills of quantities and financial rate cards, aggregated separately by region |
| Advance Payment | United Nations agency service and supply contracts commonly carry no advance payment, or pay pro rata only against an equivalent advance payment guarantee |
| Performance Security | Long-Term Agreements commonly require performance security after award, usually at a percentage of the agreement value, valid throughout the agreement period |
| Warranty and After-Sale Service | Warranties for PV modules, storage equipment and backup power supply are commonly five years or longer; agreements normally set out after-sale response times and spare parts supply arrangements |
| Payment Arrangement | Payments are commonly made in stages against acceptance of supply, installation and commissioning in each region, with the final payment released after the warranty period |
| Price Basis | Prices are commonly quoted delivered to the designated sites in each region, with transport, installation, commissioning and training costs included in the contract price |
| Insurance, Taxes and Safeguards | Contractors are commonly required to insure transport and installation works, to bear taxes under the law of the country of implementation, and to comply with UNICEF safeguards on child rights and environmental protection |